Project
CoolTeck Cold-Room Monitoring Project
Reference
—
Customer
—
Site
—
Prepared by
SSTM / CoolTeck
Date
20/09/2026
Installation basis: wired gateways are placed on the nearest practical room side/wall at an accessible mounting height. Cable quantities use actual sensor and gateway XYZ coordinates, orthogonal routing and the configured 20% route allowance.
Site measured cable
104.2 m
Site planned cable
125 m
Drum length
305 m
Approx. drums
1
Freezer 2 — Wired Installation
Blue square = sensor · red circle = gateway. Lines show the calculated orthogonal installed route to the selected side/wall gateway.